| Référence : |
100422-1 |
| Poste : |
OFPG Contract Engineer |
| Secteur : |
OIL AND GAS |
| Expérience requise : |
15 years |
| Mode : |
resident Paris, Rota 4*2 Nigeria |
| Pays : |
Paris and Nigeria |
| Localisation : |
Port Harcourt |
| Durée : |
1 year renew |
| Date de démarrage : |
01/06/2010 |
| Description du poste : |
Total E&P Nigeria Limited, affiliate of TOTAL S.A., is conducting the OFON Phase 2 project which mainly consists of the following additional surfaces facilities:
- OFP2 production platform (3X30Mw power station, oil treatment (105000bbl/d), gas treatment for export, gas lift and fuel gas, water treatment en injection, topside weight 11000t)
- OFQ living quarter platform (124 beds)
- Three wellhead platforms to accommodate 33 additional wells.
- In field Sealines and new gas export sealine.
- Modification and partial decommissioning on existing facilities (one production plaform and 2 WH platform)
As part of the Ofon Phase 2 Project, we are currently looking to subcontract part of the work concerning OFPG Contract Engineering Expertise. Please find hereto attached, as part of our call for tenders ref. OFON2/DS420 - CFT for Technical assistance – OFPG Contract Engineering Expertise, the format of Contract that shall be used with the successful tenderer.
It comprises:
- the General Conditions with Annexes 1 to 4 (in particular the Mutual Indemnity and waiver of recourse Agreement).
- the Particular Conditions (including two Attachments) with Annexes 1 to 3 (in particular technical assistance scheme conditions and HSE requirements)
You are requested to submit your tender considering:
- That the contract would be placed for 12 months but the expected total duration of the SERVICE is 3 years.
- The starting date planned is 1st of June 2010.
- The SERVICE shall be performed:
First in Paris area, France, with missions in Nigeria for around 1 to 3 months
Then as resident in Port Harcourt
|
|
|